ACS HAM/BHV - Enns/Vienna // Construction works in the area of Passau

Due to construction works between the railway stations Schärding and Passau, the whole freight traffic will be routed via Salzburg during the period from 29.03.2014 to 06.04.2014.
This alternative route is passable only with a train length of max. 610 meters.

As a result, we expect delays for the trains to/fromVienna and Enns.

The following import trains are affected by this redirection:
Departure at 30.03., 31.03., 01.04., 02.04., 03.04., 04.04.2014.

The following export trains are affected by this redirection:
Departure at 31.03., 01.04., 02.04., 03.04., 04.04., 05.04.2014.

Precautionary we have to inform you, that the liability for any costs resulting (e.g.: storage, demurrage, detention) out of a.m. problems is excluded by us.